Roofing Job Portfolio

Some of the roofing jobs successfully completed by Silktown Roofing

Mohegan Sun Casino Phase II Expansion  |  Click To View Project Details

Located in Uncasville, CT this project scope included foundation wall waterproofing, lagging wall waterproofing, cementitious waterproofing, waterproofing of all terraces, planters, waterfalls, streams, pool, reflecting pools along with approx 600,000 sqft of membrane roofing, standing seam roofing, hotel high rise roofing and various specialty sheet metal applications (both interior and exterior) and pedestal set pav


City Place, Hartford  |  Click To View Project Details

 



Connecticut Convention Center  |  Click To View Project Details

Located in Hartford, CT this project included installation of a PVC roofing membrane, sheet metal flashings along with approx 60,0000 sqft of terrace and planter waterproofing.



Weslyan Central Plant Green Roof Remediation  |  Click To View Project Details

Located in Middletown, CT the project consisted of removal of existing over-burden and waterproofing with re-installation of new waterproofing, drainage composite and over-burden with integrated leak detection system.  Size of project is approximately 19,000 sqft.



Library of Congress National Audio-Visual Conservation Center  |  Click To View Project Details

Located in Culpeper, VA this project scope included approx 5.5 acres of green roofing complete with various planting schemes, concrete paver systems, foundation wall waterproofing, cavity wall waterproofing, air vapor barriers, split slab waterproofing, epoxy blind side waterproofing, below grade Situra expansion joint assemblies, leak detection system, fast water drainage system, stainless steel metal flashing and co


University of Connecticut Law Library Facade and Roof Restoration  |  Click To View Project Details

Located in West Hartford, CT, this project required the removal of all existing granite (which was by others) installation of new air vapor barrier waterproofing on all exterior walls, new zinc coated copper in-wall and thru wall flashings, standing seam copper siding, new structural members at all dormers and several turrets.  It also required removal and re-installation of existing built up roofing, flashi